The Line 1 is predominantly aligned to the path of Taft Avenue (Radial Road 2), which was chosen largely due to its straight length. Main Line Route Map inside a second generation train October 22, 2010: Balintawak to Roosevelt.March 22, 2010: Monumento to Balintawak (except Malvar).May 12, 1985: Central Terminal to Monumento.December 1, 1984: Baclaran to Central Terminal.However, the yellow color of the line dates back to its opening in 1984. The Line 1 was known for many names such as LRT Line 1, shortened to LRT-1, Yellow Line, Green Line (2012), or the Metrorail. Passengers can transfer to the Line 2 at Doroteo Jose station, while passengers can transfer to the Line 3 at EDSAand North Avenue stations. The line runs in a general north-south direction from Baclaran to Monumento then, it runs in an east-west direction from Monumento to North Avenue, linking the cities of Quezon City, Caloocan, Manila, Pasay, and ParaƱaque. The line is colored yellow (old) and green (new) on all train maps. Presently, the line contains twenty stations and runs on 19.65 kilometers (12.21 mi) of fully elevated route. The Manila Light Rail Transit Line 1, also known as the LRT Line 1 or LRT-1 is the first metro line of the Manila Light Rail Transit Authority System. Kinki Sharyo and Nippon Sharyo 3rd Generation LRV Hyundai Precision and Adtranz 2nd Generation LRV Manila Light Rail Transit Authority System
0 Comments
Leave a Reply. |